Skip to main content

4" Dome Installation

How to install the 4-inch dome onto the wetware

Updated over 2 weeks ago

4" Dome Installation Instructions

Once the 4’’ wetware is plumbed into the manifold, here’s how to install the dome on top:

  • Remove the cap and gasket from the center of the dome

  • Power on the dome by pressing the power button on the underside of the device. The LEDs will flash white and then blink as it searches for the network

  • Position the dome over the top of the wetware, aligning the center hole over the spring tension shaft and the gap in the dome over the upper chamber outlet

  • Gently push the dome onto the top of the valve so that pegs on the underside of the dome align with the mouth of each metal dome clip on the valve body

  • Rotate the dome clockwise until the dome clips ‘click’ and the dome is securely in place

  • Reinsert the gasket in the center of the dome

  • Replace the cap by pushing it into the center of the dome until it’s flush and snaps in place

  • Place the 4-pronged green handle on top of the spring tension shaft by aligning the rectangular insert and pushing down

  • Insert the bleed needle through the center of the handle into the spring tension shaft, and gently finger tighten

  • Connect the lower chamber tube to the lower chamber port on the dome, finger tighten the nut

  • Connect the upper chamber tube to the upper chamber port on the dome, finger tighten the nut

  • Connect the antenna, solar panel/power supply, flow meter cable, and any auxiliary sensors

Completed Dome Installation

Did this answer your question?